US Bridges

I-64 Ebl over Newmarket Creek

Fair

York County, Virginia · 1.13 MI FR Route 258 · Structure no. 000000000020331

Built
1959
66 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
52 ft
1 main span
Daily traffic
48,902
2022 count
Owner
State
State Highway Agency

About this bridge

I-64 Ebl over Newmarket Creek is a prestressed concrete stringer/multi-beam or girder carrying I-64 Ebl over Newmarket Creek in York County, Virginia. It was built in 1959, so it is 66 years old, older than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 48,902 vehicles a day, projected to reach 60,841 by 2045. The structure is 52 ft (15.8 m) long and 69 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesI-64 Ebl
CrossesNewmarket Creek
Location1.13 MI FR Route 258
RouteInterstate 64
Coordinates37.03182, -76.37762
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating86 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length52 ft (15.8 m)
Longest span52 ft (15.8 m)
Deck width69 ft (21 m)
Roadway width66 ft (20.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic48,902 (2022)
Projected traffic60,841 by 2045
Trucks0%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-64 Ebl over Newmarket Creek built?

It was built in 1959, making it 66 years old in 2025.

What condition is I-64 Ebl over Newmarket Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does I-64 Ebl over Newmarket Creek carry?

About 48,902 vehicles per day (2022 count).

How long is I-64 Ebl over Newmarket Creek?

The structure is 52 ft (15.8 m) long with a longest span of 52 ft (15.8 m) and a deck 69 ft wide.

Who owns I-64 Ebl over Newmarket Creek?

It is owned by the State Highway Agency.