US Bridges

SB RTE 295 Flyover over NS Railway

Fair

Henrico County, Virginia · .24 FR 295S & 1.00 to 64E · Structure no. 000000000025642

Built
2001
24 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
164 ft
3 main spans
Daily traffic
6,292
2022 count
Owner
State
State Highway Agency

About this bridge

SB RTE 295 Flyover over NS Railway is a steel continuous stringer/multi-beam or girder carrying SB RTE 295 Flyover over NS Railway in Henrico County, Virginia. It was built in 2001, so it is 24 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,292 vehicles a day, roughly 1% of them trucks, projected to reach 9,188 by 2042. The structure is 164 ft (50 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSB RTE 295 Flyover
CrossesNS Railway
Location.24 FR 295S & 1.00 to 64E
RouteInterstate 295
Coordinates37.52364, -77.27166
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating45.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length164 ft (50 m)
Longest span64 ft (19.5 m)
Deck width46 ft (14 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,292 (2022)
Projected traffic9,188 by 2042
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SB RTE 295 Flyover over NS Railway built?

It was built in 2001, making it 24 years old in 2025.

What condition is SB RTE 295 Flyover over NS Railway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does SB RTE 295 Flyover over NS Railway carry?

About 6,292 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is SB RTE 295 Flyover over NS Railway?

The structure is 164 ft (50 m) long with a longest span of 64 ft (19.5 m) and a deck 46 ft wide.

Who owns SB RTE 295 Flyover over NS Railway?

It is owned by the State Highway Agency.