Sbl RTE 0295 Coll over NS Railway
FairHenrico County, Virginia · 0 .16 FR I-64&2.0 to 156 · Structure no. 000000000009911
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 142 ft
- 3 main spans
- Daily traffic
- 2,100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sbl RTE 0295 Coll over NS Railway is a steel stringer/multi-beam or girder carrying Sbl RTE 0295 Coll over NS Railway in Henrico County, Virginia. It was built in 1979, so it is 46 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,100 vehicles a day, roughly 10% of them trucks, projected to reach 3,067 by 2042. The structure is 142 ft (43.4 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sbl RTE 0295 Coll over NS Railway built?
It was built in 1979, making it 46 years old in 2025.
What condition is Sbl RTE 0295 Coll over NS Railway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Sbl RTE 0295 Coll over NS Railway carry?
About 2,100 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is Sbl RTE 0295 Coll over NS Railway?
The structure is 142 ft (43.4 m) long with a longest span of 48 ft (14.7 m) and a deck 44 ft wide.
Who owns Sbl RTE 0295 Coll over NS Railway?
It is owned by the State Highway Agency.