Ramp K and L of 95 over Mill RD and Parking Lot
GoodFairfax County, Virginia · 00.50FR0001/00.10TOEISENH · Structure no. 000000000027101
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,165 ft
- 11 main spans
- Daily traffic
- 3,107
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp K and L of 95 over Mill RD and Parking Lot is a steel continuous stringer/multi-beam or girder carrying Ramp K and L of 95 over Mill RD and Parking Lot in Fairfax County, Virginia. It was built in 2008, so it is 17 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,107 vehicles a day, roughly 5% of them trucks, projected to reach 3,495 by 2045. The structure is 1,165 ft (355.1 m) long and 65 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp K and L of 95 over Mill RD and Parking Lot built?
It was built in 2008, making it 17 years old in 2025.
What condition is Ramp K and L of 95 over Mill RD and Parking Lot in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Ramp K and L of 95 over Mill RD and Parking Lot carry?
About 3,107 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is Ramp K and L of 95 over Mill RD and Parking Lot?
The structure is 1,165 ft (355.1 m) long with a longest span of 108 ft (32.9 m) and a deck 65 ft wide.
Who owns Ramp K and L of 95 over Mill RD and Parking Lot?
It is owned by the State Highway Agency.