US Bridges

Ramp F & I of I-95 over Cameron Run

Good

Fairfax County, Virginia · 03.00FREISEN/00.01TO RT.1 · Structure no. 000000000027080

Built
2005
20 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
604 ft
10 main spans
Daily traffic
6,260
2022 count
Owner
State
State Highway Agency

About this bridge

Ramp F & I of I-95 over Cameron Run is a prestressed concrete continuous stringer/multi-beam or girder carrying Ramp F & I of I-95 over Cameron Run in Fairfax County, Virginia. It was built in 2005, so it is 20 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,260 vehicles a day, roughly 3% of them trucks, projected to reach 6,980 by 2045. The structure is 604 ft (184.1 m) long and 48 ft wide.

CarriesRamp F & I of I-95
CrossesCameron Run
Location03.00FREISEN/00.01TO RT.1
RouteInterstate 95
Coordinates38.79414, -77.05987
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 22 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.5 US tons
Inventory rating55.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans10
Design loadHS 20 + Mod
Structure length604 ft (184.1 m)
Longest span61 ft (18.6 m)
Deck width48 ft (14.5 m)
Roadway width47 ft (14.2 m)
Vertical clearance over deck17 ft (5.3 m)

Traffic and service

Average daily traffic6,260 (2022)
Projected traffic6,980 by 2045
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2.5 million
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp F & I of I-95 over Cameron Run built?

It was built in 2005, making it 20 years old in 2025.

What condition is Ramp F & I of I-95 over Cameron Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Ramp F & I of I-95 over Cameron Run carry?

About 6,260 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Ramp F & I of I-95 over Cameron Run?

The structure is 604 ft (184.1 m) long with a longest span of 61 ft (18.6 m) and a deck 48 ft wide.

Who owns Ramp F & I of I-95 over Cameron Run?

It is owned by the State Highway Agency.