RAMPJ&D-1TOI95SB over Fill Material

Good

Fairfax County, Virginia · 00.10FR1/00.20TO95SB · Structure no. 000000000027099

Built
2008
17 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
425 ft
7 main spans
Daily traffic
2,000
2008 count
Owner
State
State Highway Agency

About this bridge

RAMPJ&D-1TOI95SB over Fill Material is a prestressed concrete continuous stringer/multi-beam or girder carrying RAMPJ&D-1TOI95SB over Fill Material in Fairfax County, Virginia. It was built in 2008, so it is 17 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 3% of them trucks, projected to reach 15,000 by 2042. The structure is 425 ft (129.5 m) long and 48 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRAMPJ&D-1TOI95SB
CrossesFill Material
Location00.10FR1/00.20TO95SB
RouteInterstate 1
Coordinates38.79469, -77.0587
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating77.9 US tons
Inventory rating60.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans7 (+6 approach)
Design loadHS 20
Structure length425 ft (129.5 m)
Longest span63 ft (19.2 m)
Deck width48 ft (14.6 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2008)
Projected traffic15,000 by 2042
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was RAMPJ&D-1TOI95SB over Fill Material built?

It was built in 2008, making it 17 years old in 2025.

What condition is RAMPJ&D-1TOI95SB over Fill Material in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does RAMPJ&D-1TOI95SB over Fill Material carry?

About 2,000 vehicles per day (2008 count), of which roughly 3% are trucks.

How long is RAMPJ&D-1TOI95SB over Fill Material?

The structure is 425 ft (129.5 m) long with a longest span of 63 ft (19.2 m) and a deck 48 ft wide.

Who owns RAMPJ&D-1TOI95SB over Fill Material?

It is owned by the State Highway Agency.