US Bridges

1600 West Street over Highline Canal

Fair

Utah County, Utah · 11100 South 1600 West · Structure no. 049049D

Built
2003
22 years old
Condition
Fair
inspected October 2023
Type
Slab
Concrete
Length
25 ft
1 main span
Daily traffic
3,644
2022 count
Owner
County
County Highway Agency

About this bridge

1600 West Street over Highline Canal is a concrete slab carrying 1600 West Street over Highline Canal in Utah County, Utah. It was built in 2003, so it is 22 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,644 vehicles a day, roughly 5% of them trucks, projected to reach 4,373 by 2042. The structure is 25 ft (7.5 m) long and 58 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

Carries1600 West Street
CrossesHighline Canal
Location11100 South 1600 West
RouteCounty Highway 2872
StateUtah
Coordinates40.02789, -111.69189
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99.3 US tons
Inventory rating61.4 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length25 ft (7.5 m)
Longest span24 ft (7.3 m)
Deck width58 ft (17.8 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic3,644 (2022)
Projected traffic4,373 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 1600 West Street over Highline Canal built?

It was built in 2003, making it 22 years old in 2025.

What condition is 1600 West Street over Highline Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does 1600 West Street over Highline Canal carry?

About 3,644 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is 1600 West Street over Highline Canal?

The structure is 25 ft (7.5 m) long with a longest span of 24 ft (7.3 m) and a deck 58 ft wide.

Who owns 1600 West Street over Highline Canal?

It is owned by the County Highway Agency.