US Bridges

180 East Street over Highline Canal

Fair

Utah County, Utah · 1260 S. 180 E. Payson · Structure no. 049004F

Built
2001
24 years old
Condition
Fair
inspected October 2023
Type
Tee Beam
Prestressed Concrete
Length
35 ft
1 main span
Daily traffic
630
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

180 East Street over Highline Canal is a prestressed concrete tee beam carrying 180 East Street over Highline Canal in Utah County, Utah. It was built in 2001, so it is 24 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 630 vehicles a day, roughly 1% of them trucks, projected to reach 766 by 2030. The structure is 35 ft (10.7 m) long and 54 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

Carries180 East Street
CrossesHighline Canal
Location1260 S. 180 E. Payson
RouteCity Street 0
StateUtah
Coordinates40.02347, -111.72892
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length35 ft (10.7 m)
Longest span32 ft (9.8 m)
Deck width54 ft (16.5 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic630 (2010)
Projected traffic766 by 2030
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 180 East Street over Highline Canal built?

It was built in 2001, making it 24 years old in 2025.

What condition is 180 East Street over Highline Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does 180 East Street over Highline Canal carry?

About 630 vehicles per day (2010 count), of which roughly 1% are trucks.

How long is 180 East Street over Highline Canal?

The structure is 35 ft (10.7 m) long with a longest span of 32 ft (9.8 m) and a deck 54 ft wide.

Who owns 180 East Street over Highline Canal?

It is owned by the City or Municipal Highway Agency.