I-80EB (SR-80) over Int.X-Rd@parleys Summit
FairSummit County, Utah · At Parleys Summit Intchg · Structure no. 2C1004
- Built
- 2011
- 14 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 133 ft
- 1 main span
- Daily traffic
- 50,380
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
I-80EB (SR-80) over Int.X-Rd@parleys Summit is a steel stringer/multi-beam or girder carrying I-80EB (SR-80) over Int.X-Rd@parleys Summit in Summit County, Utah. It was built in 2011, so it is 14 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50,380 vehicles a day, roughly 30% of them trucks, projected to reach 62,975 by 2034. The structure is 133 ft (40.4 m) long and 76 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-80EB (SR-80) over Int.X-Rd@parleys Summit built?
It was built in 2011, making it 14 years old in 2025.
What condition is I-80EB (SR-80) over Int.X-Rd@parleys Summit in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does I-80EB (SR-80) over Int.X-Rd@parleys Summit carry?
About 50,380 vehicles per day (2014 count), of which roughly 30% are trucks.
How long is I-80EB (SR-80) over Int.X-Rd@parleys Summit?
The structure is 133 ft (40.4 m) long with a longest span of 130 ft (39.6 m) and a deck 76 ft wide.
Who owns I-80EB (SR-80) over Int.X-Rd@parleys Summit?
It is owned by the State Highway Agency.