Highland Drive over Ped. Path and Stream
FairSummit County, Utah · 1/3 Mi. E. of Kimball JCT · Structure no. 043040C
- Built
- 2006
- 19 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 378
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Highland Drive over Ped. Path and Stream is a steel stringer/multi-beam or girder carrying Highland Drive over Ped. Path and Stream in Summit County, Utah. It was built in 2006, so it is 19 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 378 vehicles a day, roughly 1% of them trucks, projected to reach 459 by 2030. The structure is 30 ft (9.1 m) long and 39 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Highland Drive over Ped. Path and Stream built?
It was built in 2006, making it 19 years old in 2025.
What condition is Highland Drive over Ped. Path and Stream in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Highland Drive over Ped. Path and Stream carry?
About 378 vehicles per day (2010 count), of which roughly 1% are trucks.
How long is Highland Drive over Ped. Path and Stream?
The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.9 m) and a deck 39 ft wide.
Who owns Highland Drive over Ped. Path and Stream?
It is owned by the County Highway Agency.