I15SBCD.RP. TOI80 over 2250 South St. & UPR
FairSalt Lake County, Utah · 350 W. 2250 So. So. Sl. · Structure no. 3F 653
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 142 ft
- 1 main span
- Daily traffic
- 268,370
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
I15SBCD.RP. TOI80 over 2250 South St. & UPR is a prestressed concrete stringer/multi-beam or girder carrying I15SBCD.RP. TOI80 over 2250 South St. & UPR in Salt Lake County, Utah. It was built in 1999, so it is 26 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 268,370 vehicles a day, roughly 15% of them trucks, projected to reach 335,463 by 2034. The structure is 142 ft (43.2 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I15SBCD.RP. TOI80 over 2250 South St. & UPR built?
It was built in 1999, making it 26 years old in 2025.
What condition is I15SBCD.RP. TOI80 over 2250 South St. & UPR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does I15SBCD.RP. TOI80 over 2250 South St. & UPR carry?
About 268,370 vehicles per day (2014 count), of which roughly 15% are trucks.
How long is I15SBCD.RP. TOI80 over 2250 South St. & UPR?
The structure is 142 ft (43.2 m) long with a longest span of 139 ft (42.3 m) and a deck 31 ft wide.
Who owns I15SBCD.RP. TOI80 over 2250 South St. & UPR?
It is owned by the State Highway Agency.