Ramp to I-80 EB over Andy AVE.(2250 S.)&

Fair

Salt Lake County, Utah · 450 West 2250 So. So.Sl. · Structure no. 3C 862

Built
1999
26 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
137 ft
1 main span
Daily traffic
268,370
2014 count
Owner
State
State Highway Agency

About this bridge

Ramp to I-80 EB over Andy AVE.(2250 S.)& is a steel stringer/multi-beam or girder carrying Ramp to I-80 EB over Andy AVE.(2250 S.)& in Salt Lake County, Utah. It was built in 1999, so it is 26 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 268,370 vehicles a day, roughly 15% of them trucks, projected to reach 335,463 by 2034. The structure is 137 ft (41.9 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp to I-80 EB
CrossesAndy AVE.(2250 S.)&
Location450 West 2250 So. So.Sl.
RouteInterstate 80
StateUtah
Coordinates40.72272, -111.90514
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating53.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length137 ft (41.9 m)
Longest span134 ft (40.8 m)
Deck width58 ft (17.7 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deck25 ft (7.7 m)

Traffic and service

Average daily traffic268,370 (2014)
Projected traffic335,463 by 2034
Trucks15%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp to I-80 EB over Andy AVE.(2250 S.)& built?

It was built in 1999, making it 26 years old in 2025.

What condition is Ramp to I-80 EB over Andy AVE.(2250 S.)& in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Ramp to I-80 EB over Andy AVE.(2250 S.)& carry?

About 268,370 vehicles per day (2014 count), of which roughly 15% are trucks.

How long is Ramp to I-80 EB over Andy AVE.(2250 S.)&?

The structure is 137 ft (41.9 m) long with a longest span of 134 ft (40.8 m) and a deck 58 ft wide.

Who owns Ramp to I-80 EB over Andy AVE.(2250 S.)&?

It is owned by the State Highway Agency.