US Bridges

I-80 (SR-80) Ebl over 2000 East Street

Good

Salt Lake County, Utah · 2400 So. & 2000 East · Structure no. 2F 942

Built
2022
3 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
103 ft
1 main span
Daily traffic
90,800
2020 count
Owner
State
State Highway Agency

About this bridge

I-80 (SR-80) Ebl over 2000 East Street is a prestressed concrete stringer/multi-beam or girder carrying I-80 (SR-80) Ebl over 2000 East Street in Salt Lake County, Utah. It was built in 2022, so it is 3 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 90,800 vehicles a day, roughly 28% of them trucks, projected to reach 134,000 by 2040. The structure is 103 ft (31.3 m) long and 78 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-80 (SR-80) Ebl
Crosses2000 East Street
Location2400 So. & 2000 East
RouteInterstate 80
StateUtah
Coordinates40.71646, -111.83409
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length103 ft (31.3 m)
Longest span99 ft (30.1 m)
Deck width78 ft (23.7 m)
Roadway width72 ft (21.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90,800 (2020)
Projected traffic134,000 by 2040
Trucks28%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80 (SR-80) Ebl over 2000 East Street built?

It was built in 2022, making it 3 years old in 2025.

What condition is I-80 (SR-80) Ebl over 2000 East Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does I-80 (SR-80) Ebl over 2000 East Street carry?

About 90,800 vehicles per day (2020 count), of which roughly 28% are trucks.

How long is I-80 (SR-80) Ebl over 2000 East Street?

The structure is 103 ft (31.3 m) long with a longest span of 99 ft (30.1 m) and a deck 78 ft wide.

Who owns I-80 (SR-80) Ebl over 2000 East Street?

It is owned by the State Highway Agency.