I-80(SR-80)EBL over SR-215(SR-215)WBL
FairSalt Lake County, Utah · I-215 Int. Parleys Canyon · Structure no. 2C 421
- Built
- 1967
- 58 years old, rebuilt 2017
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 173 ft
- 3 main spans
- Daily traffic
- 70,760
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
I-80(SR-80)EBL over SR-215(SR-215)WBL is a steel stringer/multi-beam or girder carrying I-80(SR-80)EBL over SR-215(SR-215)WBL in Salt Lake County, Utah. It was built in 1967 and reconstructed in 2017, so it is 58 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 70,760 vehicles a day, roughly 27% of them trucks, projected to reach 88,450 by 2034. The structure is 173 ft (52.7 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-80(SR-80)EBL over SR-215(SR-215)WBL built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2017.
What condition is I-80(SR-80)EBL over SR-215(SR-215)WBL in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does I-80(SR-80)EBL over SR-215(SR-215)WBL carry?
About 70,760 vehicles per day (2014 count), of which roughly 27% are trucks.
How long is I-80(SR-80)EBL over SR-215(SR-215)WBL?
The structure is 173 ft (52.7 m) long with a longest span of 77 ft (23.4 m) and a deck 36 ft wide.
Who owns I-80(SR-80)EBL over SR-215(SR-215)WBL?
It is owned by the State Highway Agency.