Center St. in Nsl. over SR-67 Legacy Parkway
FairDavis County, Utah · W.Center St.Inn.Salt Lake · Structure no. 0F 717
- Built
- 2008
- 17 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 190 ft
- 2 main spans
- Daily traffic
- 4,697
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Center St. in Nsl. over SR-67 Legacy Parkway is a prestressed concrete continuous stringer/multi-beam or girder carrying Center St. in Nsl. over SR-67 Legacy Parkway in Davis County, Utah. It was built in 2008, so it is 17 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,697 vehicles a day, roughly 12% of them trucks, projected to reach 5,636 by 2037. The structure is 190 ft (57.9 m) long and 54 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Center St. in Nsl. over SR-67 Legacy Parkway built?
It was built in 2008, making it 17 years old in 2025.
What condition is Center St. in Nsl. over SR-67 Legacy Parkway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Center St. in Nsl. over SR-67 Legacy Parkway carry?
About 4,697 vehicles per day (2017 count), of which roughly 12% are trucks.
How long is Center St. in Nsl. over SR-67 Legacy Parkway?
The structure is 190 ft (57.9 m) long with a longest span of 93 ft (28.3 m) and a deck 54 ft wide.
Who owns Center St. in Nsl. over SR-67 Legacy Parkway?
It is owned by the State Highway Agency.