US Bridges

Center St. in Nsl. over Legacy Parkway Trail

Fair

Davis County, Utah · 2000 W. Center St. in Nsl · Structure no. 011029E

Built
2008
17 years old
Condition
Fair
inspected March 2024
Type
Culvert
Concrete
Length
27 ft
1 main span
Daily traffic
1,000
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

Center St. in Nsl. over Legacy Parkway Trail is a concrete culvert carrying Center St. in Nsl. over Legacy Parkway Trail in Davis County, Utah. It was built in 2008, so it is 17 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,215 by 2030. The structure is 27 ft (8.3 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCenter St. in Nsl.
CrossesLegacy Parkway Trail
Location2000 W. Center St. in Nsl
RouteCity Street 1392
StateUtah
Coordinates40.8414, -111.94154
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating35.7 US tons
Inventory rating21.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length27 ft (8.3 m)
Longest span24 ft (7.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2010)
Projected traffic1,215 by 2030
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Center St. in Nsl. over Legacy Parkway Trail built?

It was built in 2008, making it 17 years old in 2025.

What condition is Center St. in Nsl. over Legacy Parkway Trail in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Center St. in Nsl. over Legacy Parkway Trail carry?

About 1,000 vehicles per day (2010 count), of which roughly 5% are trucks.

How long is Center St. in Nsl. over Legacy Parkway Trail?

The structure is 27 ft (8.3 m) long with a longest span of 24 ft (7.3 m).

Who owns Center St. in Nsl. over Legacy Parkway Trail?

It is owned by the City or Municipal Highway Agency.