Trinity Blvd Ebl over Boyd Branch
FairTarrant County, Texas · 0.4 MI E of FM 157 · Structure no. 022200ZT8001001
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 9,256
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Trinity Blvd Ebl over Boyd Branch is a prestressed concrete stringer/multi-beam or girder carrying Trinity Blvd Ebl over Boyd Branch in Tarrant County, Texas. It was built in 1984, so it is 41 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,256 vehicles a day, roughly 36% of them trucks, projected to reach 21,060 by 2036. The structure is 80 ft (24.4 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Trinity Blvd Ebl over Boyd Branch built?
It was built in 1984, making it 41 years old in 2025.
What condition is Trinity Blvd Ebl over Boyd Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Trinity Blvd Ebl over Boyd Branch carry?
About 9,256 vehicles per day (2014 count), of which roughly 36% are trucks.
How long is Trinity Blvd Ebl over Boyd Branch?
The structure is 80 ft (24.4 m) long with a longest span of 80 ft (24.4 m) and a deck 46 ft wide.
Who owns Trinity Blvd Ebl over Boyd Branch?
It is owned by the City or Municipal Highway Agency.