US Bridges

Euless S. Main St. over Boyd Branch

Fair

Tarrant County, Texas · 0.5 MI S of Trinity Blvd · Structure no. 022200C06213001

Built
2001
24 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
75 ft
1 main span
Daily traffic
3,565
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Euless S. Main St. over Boyd Branch is a prestressed concrete stringer/multi-beam or girder carrying Euless S. Main St. over Boyd Branch in Tarrant County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,565 vehicles a day, roughly 3% of them trucks, projected to reach 495 by 2042. The structure is 75 ft (22.9 m) long and 40 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesEuless S. Main St.
CrossesBoyd Branch
Location0.5 MI S of Trinity Blvd
RouteCity Street 0
StateTexas
Coordinates32.81192, -97.08245
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length75 ft (22.9 m)
Longest span75 ft (22.9 m)
Deck width40 ft (12.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,565 (2019)
Projected traffic495 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Euless S. Main St. over Boyd Branch built?

It was built in 2001, making it 24 years old in 2025.

What condition is Euless S. Main St. over Boyd Branch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Euless S. Main St. over Boyd Branch carry?

About 3,565 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Euless S. Main St. over Boyd Branch?

The structure is 75 ft (22.9 m) long with a longest span of 75 ft (22.9 m) and a deck 40 ft wide.

Who owns Euless S. Main St. over Boyd Branch?

It is owned by the City or Municipal Highway Agency.