US Bridges

Pipeline RD South over Trib. to W. Fork Trin

Good

Tarrant County, Texas · 0.1 MI W of American Blvd · Structure no. 022200ZP5420004

Built
2012
13 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
27 ft
2 main spans
Daily traffic
1,400
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pipeline RD South over Trib. to W. Fork Trin is a concrete culvert carrying Pipeline RD South over Trib. to W. Fork Trin in Tarrant County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,400 vehicles a day, roughly 20% of them trucks, projected to reach 1,450 by 2036. The structure is 27 ft (8.2 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPipeline RD South
CrossesTrib. to W. Fork Trin
Location0.1 MI W of American Blvd
RouteCity Street 0
StateTexas
Coordinates32.82254, -97.07353
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length27 ft (8.2 m)
Longest span12 ft (3.7 m)
Deck width46 ft (14 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,400 (2016)
Projected traffic1,450 by 2036
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pipeline RD South over Trib. to W. Fork Trin built?

It was built in 2012, making it 13 years old in 2025.

What condition is Pipeline RD South over Trib. to W. Fork Trin in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Pipeline RD South over Trib. to W. Fork Trin carry?

About 1,400 vehicles per day (2016 count), of which roughly 20% are trucks.

How long is Pipeline RD South over Trib. to W. Fork Trin?

The structure is 27 ft (8.2 m) long with a longest span of 12 ft (3.7 m) and a deck 46 ft wide.

Who owns Pipeline RD South over Trib. to W. Fork Trin?

It is owned by the City or Municipal Highway Agency.