US Bridges

Faa Road over SH 360

Fair

Tarrant County, Texas · 0.4 MI S of SH 183 · Structure no. 022200226602042

Built
1983
42 years old
Condition
Fair
inspected April 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
437 ft
4 main spans
Daily traffic
9,380
2010 count
Owner
State
State Highway Agency

About this bridge

Faa Road over SH 360 is a prestressed concrete stringer/multi-beam or girder carrying Faa Road over SH 360 in Tarrant County, Texas. It was built in 1983, so it is 42 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,380 vehicles a day, projected to reach 9,430 by 2030. The structure is 437 ft (133.2 m) long and 58 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesFaa Road
CrossesSH 360
Location0.4 MI S of SH 183
RouteCity Street 0
StateTexas
Coordinates32.83231, -97.06107
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4 (+1 approach)
Design loadHS 20
Structure length437 ft (133.2 m)
Longest span106 ft (32.3 m)
Deck width58 ft (17.7 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,380 (2010)
Projected traffic9,430 by 2030
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$745,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Faa Road over SH 360 built?

It was built in 1983, making it 42 years old in 2025.

What condition is Faa Road over SH 360 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2022.

How much traffic does Faa Road over SH 360 carry?

About 9,380 vehicles per day (2010 count).

How long is Faa Road over SH 360?

The structure is 437 ft (133.2 m) long with a longest span of 106 ft (32.3 m) and a deck 58 ft wide.

Who owns Faa Road over SH 360?

It is owned by the State Highway Agency.