US Bridges

Merrick Street over Lake Como Spillway

Fair

Tarrant County, Texas · 100 Ft. W Lake Como Ct · Structure no. 022200ZM5430001

Built
1988
37 years old
Condition
Fair
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
104 ft
2 main spans
Daily traffic
845
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Merrick Street over Lake Como Spillway is a prestressed concrete box beam or girders - multiple carrying Merrick Street over Lake Como Spillway in Tarrant County, Texas. It was built in 1988, so it is 37 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 845 vehicles a day, roughly 1% of them trucks, projected to reach 1,785 by 2034. The structure is 104 ft (31.7 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMerrick Street
CrossesLake Como Spillway
Location100 Ft. W Lake Como Ct
RouteCity Street 0
StateTexas
Coordinates32.72679, -97.39815
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length104 ft (31.7 m)
Longest span52 ft (15.9 m)
Deck width36 ft (11.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic845 (2024)
Projected traffic1,785 by 2034
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Merrick Street over Lake Como Spillway built?

It was built in 1988, making it 37 years old in 2025.

What condition is Merrick Street over Lake Como Spillway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Merrick Street over Lake Como Spillway carry?

About 845 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Merrick Street over Lake Como Spillway?

The structure is 104 ft (31.7 m) long with a longest span of 52 ft (15.9 m) and a deck 36 ft wide.

Who owns Merrick Street over Lake Como Spillway?

It is owned by the City or Municipal Highway Agency.