US Bridges

IH 30 WB FR over US 377/CAMP Bowie NB

Fair

Tarrant County, Texas · 0.2 MI E of Horne ST · Structure no. 022200106801168

Built
1988
37 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
155 ft
2 main spans
Daily traffic
3,248
2019 count
Owner
State
State Highway Agency

About this bridge

IH 30 WB FR over US 377/CAMP Bowie NB is a prestressed concrete stringer/multi-beam or girder carrying IH 30 WB FR over US 377/CAMP Bowie NB in Tarrant County, Texas. It was built in 1988, so it is 37 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,248 vehicles a day, roughly 9% of them trucks, projected to reach 700 by 2033. The structure is 155 ft (47.2 m) long and 57 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 30 WB FR
CrossesUS 377/CAMP Bowie NB
Location0.2 MI E of Horne ST
RouteInterstate 30
StateTexas
Coordinates32.73328, -97.40494
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckCorrugated steel
Main spans2
Design loadHS 20
Structure length155 ft (47.2 m)
Longest span79 ft (24.1 m)
Deck width57 ft (17.4 m)
Roadway width49 ft (14.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,248 (2019)
Projected traffic700 by 2033
Trucks9%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$21,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 30 WB FR over US 377/CAMP Bowie NB built?

It was built in 1988, making it 37 years old in 2025.

What condition is IH 30 WB FR over US 377/CAMP Bowie NB in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does IH 30 WB FR over US 377/CAMP Bowie NB carry?

About 3,248 vehicles per day (2019 count), of which roughly 9% are trucks.

How long is IH 30 WB FR over US 377/CAMP Bowie NB?

The structure is 155 ft (47.2 m) long with a longest span of 79 ft (24.1 m) and a deck 57 ft wide.

Who owns IH 30 WB FR over US 377/CAMP Bowie NB?

It is owned by the State Highway Agency.