US Bridges

IH 30 WB Ml over US 377/CAMP Bowie Blvd.

Good

Tarrant County, Texas · 0.2 MI E of Horne ST · Structure no. 022200106801351

Built
1988
37 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
431 ft
2 main spans
Daily traffic
54,330
2022 count
Owner
State
State Highway Agency

About this bridge

IH 30 WB Ml over US 377/CAMP Bowie Blvd. is a prestressed concrete stringer/multi-beam or girder carrying IH 30 WB Ml over US 377/CAMP Bowie Blvd. in Tarrant County, Texas. It was built in 1988, so it is 37 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 54,330 vehicles a day, roughly 6% of them trucks, projected to reach 76,062 by 2042. The structure is 431 ft (131.4 m) long and 58 ft wide.

CarriesIH 30 WB Ml
CrossesUS 377/CAMP Bowie Blvd.
Location0.2 MI E of Horne ST
RouteInterstate 30
StateTexas
Coordinates32.73381, -97.40374
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+3 approach)
Design loadHS 20
Structure length431 ft (131.4 m)
Longest span130 ft (39.6 m)
Deck width58 ft (17.7 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic54,330 (2022)
Projected traffic76,062 by 2042
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 30 WB Ml over US 377/CAMP Bowie Blvd. built?

It was built in 1988, making it 37 years old in 2025.

What condition is IH 30 WB Ml over US 377/CAMP Bowie Blvd. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does IH 30 WB Ml over US 377/CAMP Bowie Blvd. carry?

About 54,330 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is IH 30 WB Ml over US 377/CAMP Bowie Blvd.?

The structure is 431 ft (131.4 m) long with a longest span of 130 ft (39.6 m) and a deck 58 ft wide.

Who owns IH 30 WB Ml over US 377/CAMP Bowie Blvd.?

It is owned by the State Highway Agency.