IH 30 WB Ml over US 377/CAMP Bowie Blvd.
GoodTarrant County, Texas · 0.2 MI E of Horne ST · Structure no. 022200106801351
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 431 ft
- 2 main spans
- Daily traffic
- 54,330
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH 30 WB Ml over US 377/CAMP Bowie Blvd. is a prestressed concrete stringer/multi-beam or girder carrying IH 30 WB Ml over US 377/CAMP Bowie Blvd. in Tarrant County, Texas. It was built in 1988, so it is 37 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 54,330 vehicles a day, roughly 6% of them trucks, projected to reach 76,062 by 2042. The structure is 431 ft (131.4 m) long and 58 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 30 WB Ml over US 377/CAMP Bowie Blvd. built?
It was built in 1988, making it 37 years old in 2025.
What condition is IH 30 WB Ml over US 377/CAMP Bowie Blvd. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does IH 30 WB Ml over US 377/CAMP Bowie Blvd. carry?
About 54,330 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is IH 30 WB Ml over US 377/CAMP Bowie Blvd.?
The structure is 431 ft (131.4 m) long with a longest span of 130 ft (39.6 m) and a deck 58 ft wide.
Who owns IH 30 WB Ml over US 377/CAMP Bowie Blvd.?
It is owned by the State Highway Agency.