Pipeline RD over Walker Branch
FairTarrant County, Texas · 0.4 MI E of SH 121 · Structure no. 022200E03360001
- Built
- 1960
- 65 years old, rebuilt 1970
- Condition
- Fair
- inspected July 2024
- Type
- Culvert
- Concrete
- Length
- 45 ft
- 4 main spans
- Daily traffic
- 14,981
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Pipeline RD over Walker Branch is a concrete culvert carrying Pipeline RD over Walker Branch in Tarrant County, Texas. It was built in 1960 and reconstructed in 1970, so it is 65 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,981 vehicles a day, roughly 4% of them trucks, projected to reach 20,630 by 2039. The structure is 45 ft (13.6 m) long and 77 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pipeline RD over Walker Branch built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1970.
What condition is Pipeline RD over Walker Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Pipeline RD over Walker Branch carry?
About 14,981 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is Pipeline RD over Walker Branch?
The structure is 45 ft (13.6 m) long with a longest span of 10 ft (3 m) and a deck 77 ft wide.
Who owns Pipeline RD over Walker Branch?
It is owned by the City or Municipal Highway Agency.