Tin Top RD Pct 3 over Trib of Falley Branch
FairParker County, Texas · 2.8 MI S of IH 20 · Structure no. 021840AA0124002
- Built
- 1946
- 79 years old, rebuilt 1987
- Condition
- Fair
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 34 ft
- 2 main spans
- Daily traffic
- 4,914
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Tin Top RD Pct 3 over Trib of Falley Branch is a concrete continuous slab carrying Tin Top RD Pct 3 over Trib of Falley Branch in Parker County, Texas. It was built in 1946 and reconstructed in 1987, so it is 79 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,914 vehicles a day, projected to reach 3,440 by 2029. The structure is 34 ft (10.4 m) long and 26 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tin Top RD Pct 3 over Trib of Falley Branch built?
It was built in 1946, making it 79 years old in 2025. It was reconstructed in 1987.
What condition is Tin Top RD Pct 3 over Trib of Falley Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Tin Top RD Pct 3 over Trib of Falley Branch carry?
About 4,914 vehicles per day (2024 count).
How long is Tin Top RD Pct 3 over Trib of Falley Branch?
The structure is 34 ft (10.4 m) long with a longest span of 17 ft (5.2 m) and a deck 26 ft wide.
Who owns Tin Top RD Pct 3 over Trib of Falley Branch?
It is owned by the County Highway Agency.