FM 3083 over Stewarts Creek
GoodMontgomery County, Texas · 1.10 MI E of US 75 · Structure no. 121700315801006
- Built
- 1989
- 36 years old, rebuilt 2020
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 19,282
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
FM 3083 over Stewarts Creek is a prestressed concrete box beam or girders - multiple carrying FM 3083 over Stewarts Creek in Montgomery County, Texas. It was built in 1989 and reconstructed in 2020, so it is 36 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,282 vehicles a day, roughly 8% of them trucks, projected to reach 25,745 by 2039. The structure is 120 ft (36.6 m) long and 87 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 3083 over Stewarts Creek built?
It was built in 1989, making it 36 years old in 2025. It was reconstructed in 2020.
What condition is FM 3083 over Stewarts Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does FM 3083 over Stewarts Creek carry?
About 19,282 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is FM 3083 over Stewarts Creek?
The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 87 ft wide.
Who owns FM 3083 over Stewarts Creek?
It is owned by the State Highway Agency.