US Bridges

FM 3083 over UPRR

Good

Montgomery County, Texas · 0.8 MI E of SH 75 · Structure no. 121700315801009

Built
2020
5 years old
Condition
Good
inspected December 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,204 ft
12 main spans
Daily traffic
21,454
2019 count
Owner
State
State Highway Agency

About this bridge

FM 3083 over UPRR is a prestressed concrete stringer/multi-beam or girder carrying FM 3083 over UPRR in Montgomery County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,454 vehicles a day, roughly 8% of them trucks, projected to reach 25,745 by 2039. The structure is 1,204 ft (367 m) long and 87 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFM 3083
CrossesUPRR
Location0.8 MI E of SH 75
RouteState Highway 3083
StateTexas
Coordinates30.34991, -95.4589
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans12
Design loadHL 93
Structure length1,204 ft (367 m)
Longest span110 ft (33.5 m)
Deck width87 ft (26.5 m)
Roadway width68 ft (20.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,454 (2019)
Projected traffic25,745 by 2039
Trucks8%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FM 3083 over UPRR built?

It was built in 2020, making it 5 years old in 2025.

What condition is FM 3083 over UPRR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does FM 3083 over UPRR carry?

About 21,454 vehicles per day (2019 count), of which roughly 8% are trucks.

How long is FM 3083 over UPRR?

The structure is 1,204 ft (367 m) long with a longest span of 110 ft (33.5 m) and a deck 87 ft wide.

Who owns FM 3083 over UPRR?

It is owned by the State Highway Agency.