Mike Meador Pkwy over Stewarts Creek
GoodMontgomery County, Texas · 0.13 MI N of N Loop 336 · Structure no. 121700C00819002
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 240 ft
- 3 main spans
- Daily traffic
- 9,010
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Mike Meador Pkwy over Stewarts Creek is a prestressed concrete stringer/multi-beam or girder carrying Mike Meador Pkwy over Stewarts Creek in Montgomery County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,010 vehicles a day, roughly 5% of them trucks, projected to reach 12,614 by 2042. The structure is 240 ft (73.2 m) long and 87 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mike Meador Pkwy over Stewarts Creek built?
It was built in 2011, making it 14 years old in 2025.
What condition is Mike Meador Pkwy over Stewarts Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Mike Meador Pkwy over Stewarts Creek carry?
About 9,010 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Mike Meador Pkwy over Stewarts Creek?
The structure is 240 ft (73.2 m) long with a longest span of 80 ft (24.4 m) and a deck 87 ft wide.
Who owns Mike Meador Pkwy over Stewarts Creek?
It is owned by the City or Municipal Highway Agency.