Spur 215 over Alligator Bayou
FairJefferson County, Texas · 1.1 MI SE of SH 73 · Structure no. 201240050806021
- Built
- 1961
- 64 years old, rebuilt 1990
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 182 ft
- 6 main spans
- Daily traffic
- 9,395
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Spur 215 over Alligator Bayou is a concrete stringer/multi-beam or girder carrying Spur 215 over Alligator Bayou in Jefferson County, Texas. It was built in 1961 and reconstructed in 1990, so it is 64 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,395 vehicles a day, roughly 9% of them trucks, projected to reach 11,790 by 2033. The structure is 182 ft (55.5 m) long and 54 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Spur 215 over Alligator Bayou built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1990.
What condition is Spur 215 over Alligator Bayou in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Spur 215 over Alligator Bayou carry?
About 9,395 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is Spur 215 over Alligator Bayou?
The structure is 182 ft (55.5 m) long with a longest span of 30 ft (9.1 m) and a deck 54 ft wide.
Who owns Spur 215 over Alligator Bayou?
It is owned by the State Highway Agency.