US Bridges

SH 73 over Main B Canal

Good

Jefferson County, Texas · 0.6 MI SW of US 69 · Structure no. 201240050804344

Built
1999
26 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
256 ft
3 main spans
Daily traffic
23,757
2020 count
Owner
State
State Highway Agency

About this bridge

SH 73 over Main B Canal is a prestressed concrete stringer/multi-beam or girder carrying SH 73 over Main B Canal in Jefferson County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23,757 vehicles a day, roughly 8% of them trucks, projected to reach 42,060 by 2033. The structure is 256 ft (78 m) long and 79 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSH 73
CrossesMain B Canal
Location0.6 MI SW of US 69
RouteState Highway 73
StateTexas
Coordinates29.91151, -93.96197
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length256 ft (78 m)
Longest span85 ft (25.9 m)
Deck width79 ft (24.1 m)
Roadway width74 ft (22.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,757 (2020)
Projected traffic42,060 by 2033
Trucks8%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$234,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 73 over Main B Canal built?

It was built in 1999, making it 26 years old in 2025.

What condition is SH 73 over Main B Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SH 73 over Main B Canal carry?

About 23,757 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is SH 73 over Main B Canal?

The structure is 256 ft (78 m) long with a longest span of 85 ft (25.9 m) and a deck 79 ft wide.

Who owns SH 73 over Main B Canal?

It is owned by the State Highway Agency.