Stewart ST - Pct 4 over Br of Cameron Creek
FairPosted for loadJack County, Texas · 0.3 MI North of SH 114 · Structure no. 021200AA0191001
- Built
- 1948
- 77 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 29 ft
- 1 main span
- Daily traffic
- 100
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Stewart ST - Pct 4 over Br of Cameron Creek is a steel stringer/multi-beam or girder carrying Stewart ST - Pct 4 over Br of Cameron Creek in Jack County, Texas. It was built in 1948, so it is 77 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, projected to reach 100 by 2031. The structure is 29 ft (8.8 m) long and 12 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stewart ST - Pct 4 over Br of Cameron Creek built?
It was built in 1948, making it 77 years old in 2025.
What condition is Stewart ST - Pct 4 over Br of Cameron Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Stewart ST - Pct 4 over Br of Cameron Creek carry?
About 100 vehicles per day (2019 count).
How long is Stewart ST - Pct 4 over Br of Cameron Creek?
The structure is 29 ft (8.8 m) long with a longest span of 28 ft (8.5 m) and a deck 12 ft wide.
Who owns Stewart ST - Pct 4 over Br of Cameron Creek?
It is owned by the County Highway Agency.