US Bridges

SH 114 over Tributary Cameron Creek

Fair

Jack County, Texas · 0.1 MI W of FM-1191 South · Structure no. 021200044402011

Built
1939
86 years old
Condition
Fair
inspected February 2023
Type
Culvert
Concrete
Length
27 ft
3 main spans
Daily traffic
1,517
2023 count
Owner
State
State Highway Agency

About this bridge

SH 114 over Tributary Cameron Creek is a concrete culvert carrying SH 114 over Tributary Cameron Creek in Jack County, Texas. It was built in 1939, so it is 86 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,517 vehicles a day, roughly 18% of them trucks, projected to reach 2,530 by 2033. The structure is 27 ft (8.2 m) long and 46 ft wide. If it were closed, the detour would be 21.1 mi (34 km).

CarriesSH 114
CrossesTributary Cameron Creek
Location0.1 MI W of FM-1191 South
RouteState Highway 114
StateTexas
Coordinates33.26416, -98.37952
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadH 15
Structure length27 ft (8.2 m)
Longest span8 ft (2.4 m)
Deck width46 ft (14 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,517 (2023)
Projected traffic2,530 by 2033
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed21.1 mi (34 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 114 over Tributary Cameron Creek built?

It was built in 1939, making it 86 years old in 2025.

What condition is SH 114 over Tributary Cameron Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does SH 114 over Tributary Cameron Creek carry?

About 1,517 vehicles per day (2023 count), of which roughly 18% are trucks.

How long is SH 114 over Tributary Cameron Creek?

The structure is 27 ft (8.2 m) long with a longest span of 8 ft (2.4 m) and a deck 46 ft wide.

Who owns SH 114 over Tributary Cameron Creek?

It is owned by the State Highway Agency.