US Bridges

FM 2950 over Cameron Creek

Good

Jack County, Texas · 0.4 MI N of SH-114 · Structure no. 021200300901001

Built
1966
59 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
80 ft
2 main spans
Daily traffic
90
2023 count
Owner
State
State Highway Agency

About this bridge

FM 2950 over Cameron Creek is a concrete stringer/multi-beam or girder carrying FM 2950 over Cameron Creek in Jack County, Texas. It was built in 1966, so it is 59 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 90 vehicles a day, roughly 43% of them trucks, projected to reach 150 by 2033. The structure is 80 ft (24.4 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFM 2950
CrossesCameron Creek
Location0.4 MI N of SH-114
RouteState Highway 2950
StateTexas
Coordinates33.27202, -98.40702
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadH 15
Structure length80 ft (24.4 m)
Longest span40 ft (12.2 m)
Deck width28 ft (8.4 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2023)
Projected traffic150 by 2033
Trucks43%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2950 over Cameron Creek built?

It was built in 1966, making it 59 years old in 2025.

What condition is FM 2950 over Cameron Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does FM 2950 over Cameron Creek carry?

About 90 vehicles per day (2023 count), of which roughly 43% are trucks.

How long is FM 2950 over Cameron Creek?

The structure is 80 ft (24.4 m) long with a longest span of 40 ft (12.2 m) and a deck 28 ft wide.

Who owns FM 2950 over Cameron Creek?

It is owned by the State Highway Agency.