US Bridges

US 75 SB Exit Ramp over Washington ST & Creek

Good

Grayson County, Texas · 2.2 MI S of US 82 · Structure no. 010920004702693

Built
2022
3 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
589 ft
6 main spans
Daily traffic
8,450
2020 count
Owner
State
State Highway Agency

About this bridge

US 75 SB Exit Ramp over Washington ST & Creek is a prestressed concrete stringer/multi-beam or girder carrying US 75 SB Exit Ramp over Washington ST & Creek in Grayson County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,450 vehicles a day, roughly 1% of them trucks, projected to reach 8,260 by 2040. The structure is 589 ft (179.5 m) long and 28 ft wide.

CarriesUS 75 SB Exit Ramp
CrossesWashington ST & Creek
Location2.2 MI S of US 82
RouteU.S. Route 75
StateTexas
Coordinates33.64004, -96.61612
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length589 ft (179.5 m)
Longest span105 ft (31.9 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,450 (2020)
Projected traffic8,260 by 2040
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 75 SB Exit Ramp over Washington ST & Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is US 75 SB Exit Ramp over Washington ST & Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does US 75 SB Exit Ramp over Washington ST & Creek carry?

About 8,450 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is US 75 SB Exit Ramp over Washington ST & Creek?

The structure is 589 ft (179.5 m) long with a longest span of 105 ft (31.9 m) and a deck 28 ft wide.

Who owns US 75 SB Exit Ramp over Washington ST & Creek?

It is owned by the State Highway Agency.