US Bridges

US 75 NB Ent Ramp over Row

Good

Grayson County, Texas · 2.3 MI S of US 82 · Structure no. 010920004702692

Built
2022
3 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
535 ft
5 main spans
Daily traffic
7,050
2020 count
Owner
State
State Highway Agency

About this bridge

US 75 NB Ent Ramp over Row is a prestressed concrete stringer/multi-beam or girder carrying US 75 NB Ent Ramp over Row in Grayson County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,050 vehicles a day, projected to reach 9,516 by 2040. The structure is 535 ft (163 m) long and 28 ft wide.

CarriesUS 75 NB Ent Ramp
CrossesRow
Location2.3 MI S of US 82
RouteU.S. Route 75
StateTexas
Coordinates33.63798, -96.61627
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length535 ft (163 m)
Longest span107 ft (32.6 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,050 (2020)
Projected traffic9,516 by 2040
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 75 NB Ent Ramp over Row built?

It was built in 2022, making it 3 years old in 2025.

What condition is US 75 NB Ent Ramp over Row in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does US 75 NB Ent Ramp over Row carry?

About 7,050 vehicles per day (2020 count).

How long is US 75 NB Ent Ramp over Row?

The structure is 535 ft (163 m) long with a longest span of 107 ft (32.6 m) and a deck 28 ft wide.

Who owns US 75 NB Ent Ramp over Row?

It is owned by the State Highway Agency.