US Bridges

US 75 SB Entr Ramp over East Fork Post Oak Creek

Fair

Grayson County, Texas · 1.9 MI S of US 82 · Structure no. 010920004702259

Built
1985
40 years old
Condition
Fair
inspected May 2023
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
610
2013 count
Owner
State
State Highway Agency

About this bridge

US 75 SB Entr Ramp over East Fork Post Oak Creek is a concrete culvert carrying US 75 SB Entr Ramp over East Fork Post Oak Creek in Grayson County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 610 vehicles a day, roughly 6% of them trucks, projected to reach 850 by 2033. The structure is 32 ft (9.8 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 75 SB Entr Ramp
CrossesEast Fork Post Oak Creek
Location1.9 MI S of US 82
RouteU.S. Route 75
StateTexas
Coordinates33.64368, -96.61429
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic610 (2013)
Projected traffic850 by 2033
Trucks6%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 75 SB Entr Ramp over East Fork Post Oak Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is US 75 SB Entr Ramp over East Fork Post Oak Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does US 75 SB Entr Ramp over East Fork Post Oak Creek carry?

About 610 vehicles per day (2013 count), of which roughly 6% are trucks.

How long is US 75 SB Entr Ramp over East Fork Post Oak Creek?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m).

Who owns US 75 SB Entr Ramp over East Fork Post Oak Creek?

It is owned by the State Highway Agency.