Nevarez RD over Franklin Canal
GoodEl Paso County, Texas · 0.02 MI SW of SH 20 · Structure no. 240720B47570001
- Built
- 1970
- 55 years old
- Condition
- Good
- inspected April 2024
- Type
- Other
- Prestressed Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 2,266
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Nevarez RD over Franklin Canal is a prestressed concrete other carrying Nevarez RD over Franklin Canal in El Paso County, Texas. It was built in 1970, so it is 55 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,266 vehicles a day, roughly 4% of them trucks, projected to reach 3,172 by 2040. The structure is 39 ft (11.9 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nevarez RD over Franklin Canal built?
It was built in 1970, making it 55 years old in 2025.
What condition is Nevarez RD over Franklin Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Nevarez RD over Franklin Canal carry?
About 2,266 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Nevarez RD over Franklin Canal?
The structure is 39 ft (11.9 m) long with a longest span of 39 ft (11.9 m) and a deck 45 ft wide.
Who owns Nevarez RD over Franklin Canal?
It is owned by the City or Municipal Highway Agency.