Sl 375 Nbfr over UPRR and Middle Drain
GoodEl Paso County, Texas · 2.0 MI SW of IH 10 · Structure no. 240720255203335
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,070 ft
- 10 main spans
- Daily traffic
- 25,537
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sl 375 Nbfr over UPRR and Middle Drain is a prestressed concrete stringer/multi-beam or girder carrying Sl 375 Nbfr over UPRR and Middle Drain in El Paso County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,537 vehicles a day, roughly 7% of them trucks, projected to reach 49,031 by 2042. The structure is 1,070 ft (326 m) long and 54 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sl 375 Nbfr over UPRR and Middle Drain built?
It was built in 2023, making it 2 years old in 2025.
What condition is Sl 375 Nbfr over UPRR and Middle Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Sl 375 Nbfr over UPRR and Middle Drain carry?
About 25,537 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Sl 375 Nbfr over UPRR and Middle Drain?
The structure is 1,070 ft (326 m) long with a longest span of 128 ft (39 m) and a deck 54 ft wide.
Who owns Sl 375 Nbfr over UPRR and Middle Drain?
It is owned by the State Highway Agency.