US Bridges

Lina ST over Trib of Furneaux CR

Fair

Denton County, Texas · 0.05 MI S Rosemeade Pkwy · Structure no. 1806109L5700001

Built
1983
42 years old
Condition
Fair
inspected December 2022
Type
Culvert
Concrete
Length
34 ft
3 main spans
Daily traffic
4,670
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lina ST over Trib of Furneaux CR is a concrete culvert carrying Lina ST over Trib of Furneaux CR in Denton County, Texas. It was built in 1983, so it is 42 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,670 vehicles a day, projected to reach 7,500 by 2030. The structure is 34 ft (10.4 m) long and 64 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLina ST
CrossesTrib of Furneaux CR
Location0.05 MI S Rosemeade Pkwy
RouteCity Street 0
StateTexas
Coordinates33.01016, -96.84714
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length34 ft (10.4 m)
Longest span9 ft (2.7 m)
Deck width64 ft (19.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,670 (2019)
Projected traffic7,500 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lina ST over Trib of Furneaux CR built?

It was built in 1983, making it 42 years old in 2025.

What condition is Lina ST over Trib of Furneaux CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2022.

How much traffic does Lina ST over Trib of Furneaux CR carry?

About 4,670 vehicles per day (2019 count).

How long is Lina ST over Trib of Furneaux CR?

The structure is 34 ft (10.4 m) long with a longest span of 9 ft (2.7 m) and a deck 64 ft wide.

Who owns Lina ST over Trib of Furneaux CR?

It is owned by the City or Municipal Highway Agency.