US Bridges

Pgbt EB over Rosemeade Pkwy

Fair

Denton County, Texas · 1.15 MI W of Dallas Tlwy · Structure no. 180610296404542

Built
2001
24 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
277 ft
1 main span
Daily traffic
63,748
2023 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Pgbt EB over Rosemeade Pkwy is a prestressed concrete stringer/multi-beam or girder carrying Pgbt EB over Rosemeade Pkwy in Denton County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 63,748 vehicles a day, roughly 7% of them trucks, projected to reach 50,800 by 2034. The structure is 277 ft (84.4 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPgbt EB
CrossesRosemeade Pkwy
Location1.15 MI W of Dallas Tlwy
StateTexas
Coordinates33.01139, -96.84821
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+2 approach)
Design loadHS 20
Structure length277 ft (84.4 m)
Longest span122 ft (37.2 m)
Deck width70 ft (21.3 m)
Roadway width54 ft (16.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic63,748 (2023)
Projected traffic50,800 by 2034
Trucks7%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pgbt EB over Rosemeade Pkwy built?

It was built in 2001, making it 24 years old in 2025.

What condition is Pgbt EB over Rosemeade Pkwy in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Pgbt EB over Rosemeade Pkwy carry?

About 63,748 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is Pgbt EB over Rosemeade Pkwy?

The structure is 277 ft (84.4 m) long with a longest span of 122 ft (37.2 m) and a deck 70 ft wide.

Who owns Pgbt EB over Rosemeade Pkwy?

It is owned by the Local Toll Authority.