US Bridges

SH 114 EB Ramp over R.O.W

Good

Denton County, Texas · 0.5 MI W of US 377 · Structure no. 180610035309530

Built
2023
2 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
361 ft
4 main spans
Daily traffic
5,575
2018 count
Owner
State
State Highway Agency

About this bridge

SH 114 EB Ramp over R.O.W is a prestressed concrete stringer/multi-beam or girder carrying SH 114 EB Ramp over R.O.W in Denton County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,575 vehicles a day, roughly 10% of them trucks, projected to reach 1 by 1900. The structure is 361 ft (110 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSH 114 EB Ramp
CrossesR.O.W
Location0.5 MI W of US 377
RouteState Highway 114
StateTexas
Coordinates33.014, -97.22581
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHL 93
Structure length361 ft (110 m)
Longest span121 ft (36.9 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,575 (2018)
Projected traffic1 by 1900
Trucks10%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 114 EB Ramp over R.O.W built?

It was built in 2023, making it 2 years old in 2025.

What condition is SH 114 EB Ramp over R.O.W in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SH 114 EB Ramp over R.O.W carry?

About 5,575 vehicles per day (2018 count), of which roughly 10% are trucks.

How long is SH 114 EB Ramp over R.O.W?

The structure is 361 ft (110 m) long with a longest span of 121 ft (36.9 m) and a deck 30 ft wide.

Who owns SH 114 EB Ramp over R.O.W?

It is owned by the State Highway Agency.