IH 35E NB Off-Ramp over Timber Creek
GoodDenton County, Texas · 1.10 MI NW of Dallas C/L · Structure no. 180610019602308
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 160 ft
- 2 main spans
- Daily traffic
- 15,300
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E NB Off-Ramp over Timber Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 35E NB Off-Ramp over Timber Creek in Denton County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,300 vehicles a day, roughly 7% of them trucks, projected to reach 21,430 by 2033. The structure is 160 ft (48.8 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E NB Off-Ramp over Timber Creek built?
It was built in 2006, making it 19 years old in 2025.
What condition is IH 35E NB Off-Ramp over Timber Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does IH 35E NB Off-Ramp over Timber Creek carry?
About 15,300 vehicles per day (2013 count), of which roughly 7% are trucks.
How long is IH 35E NB Off-Ramp over Timber Creek?
The structure is 160 ft (48.8 m) long with a longest span of 80 ft (24.4 m) and a deck 28 ft wide.
Who owns IH 35E NB Off-Ramp over Timber Creek?
It is owned by the State Highway Agency.