IH 35E Nbml over Timber Creek
FairDenton County, Texas · 1.10 MI NW of Dallas C/L · Structure no. 180610019602290
- Built
- 1996
- 29 years old, rebuilt 2006
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 400 ft
- 5 main spans
- Daily traffic
- 84,023
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E Nbml over Timber Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 35E Nbml over Timber Creek in Denton County, Texas. It was built in 1996 and reconstructed in 2006, so it is 29 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 84,023 vehicles a day, roughly 7% of them trucks, projected to reach 107,150 by 2033. The structure is 400 ft (121.9 m) long and 102 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E Nbml over Timber Creek built?
It was built in 1996, making it 29 years old in 2025. It was reconstructed in 2006.
What condition is IH 35E Nbml over Timber Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does IH 35E Nbml over Timber Creek carry?
About 84,023 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is IH 35E Nbml over Timber Creek?
The structure is 400 ft (121.9 m) long with a longest span of 80 ft (24.4 m) and a deck 102 ft wide.
Who owns IH 35E Nbml over Timber Creek?
It is owned by the State Highway Agency.