IH 35E Sbfr over Timber Creek
GoodDenton County, Texas · 1.10 MI NW of Dallas C/L · Structure no. 180610019602224
- Built
- 1982
- 43 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 400 ft
- 5 main spans
- Daily traffic
- 14,460
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E Sbfr over Timber Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 35E Sbfr over Timber Creek in Denton County, Texas. It was built in 1982, so it is 43 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,460 vehicles a day, roughly 8% of them trucks, projected to reach 20,780 by 2033. The structure is 400 ft (121.9 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E Sbfr over Timber Creek built?
It was built in 1982, making it 43 years old in 2025.
What condition is IH 35E Sbfr over Timber Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does IH 35E Sbfr over Timber Creek carry?
About 14,460 vehicles per day (2013 count), of which roughly 8% are trucks.
How long is IH 35E Sbfr over Timber Creek?
The structure is 400 ft (121.9 m) long with a longest span of 80 ft (24.4 m) and a deck 35 ft wide.
Who owns IH 35E Sbfr over Timber Creek?
It is owned by the State Highway Agency.