Wintergreen RD over Stewart Branch
GoodDallas County, Texas · 0.10 MI E of Duncanville · Structure no. 180570LZ4894001
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 105 ft
- 1 main span
- Daily traffic
- 4,200
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Wintergreen RD over Stewart Branch is a prestressed concrete stringer/multi-beam or girder carrying Wintergreen RD over Stewart Branch in Dallas County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,200 vehicles a day, roughly 3% of them trucks, projected to reach 5,900 by 2021. The structure is 105 ft (32 m) long and 67 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wintergreen RD over Stewart Branch built?
It was built in 2021, making it 4 years old in 2025.
What condition is Wintergreen RD over Stewart Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Wintergreen RD over Stewart Branch carry?
About 4,200 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is Wintergreen RD over Stewart Branch?
The structure is 105 ft (32 m) long with a longest span of 105 ft (32 m) and a deck 67 ft wide.
Who owns Wintergreen RD over Stewart Branch?
It is owned by the City or Municipal Highway Agency.