US Bridges

US 67 & Main ST over Draw

Fair

Dallas County, Texas · 2.80 MI SW of IH 20 · Structure no. 180570026102053

Built
1975
50 years old, rebuilt 1983
Condition
Fair
inspected January 2024
Type
Culvert
Concrete
Length
23 ft
3 main spans
Daily traffic
88,584
2023 count
Owner
State
State Highway Agency

About this bridge

US 67 & Main ST over Draw is a concrete culvert carrying US 67 & Main ST over Draw in Dallas County, Texas. It was built in 1975 and reconstructed in 1983, so it is 50 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 88,584 vehicles a day, roughly 15% of them trucks, projected to reach 144,940 by 2038. The structure is 23 ft (7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUS 67 & Main ST
CrossesDraw
Location2.80 MI SW of IH 20
RouteU.S. Route 67
StateTexas
Coordinates32.62548, -96.90814
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length23 ft (7 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic88,584 (2023)
Projected traffic144,940 by 2038
Trucks15%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 67 & Main ST over Draw built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 1983.

What condition is US 67 & Main ST over Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does US 67 & Main ST over Draw carry?

About 88,584 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is US 67 & Main ST over Draw?

The structure is 23 ft (7 m) long with a longest span of 6 ft (1.8 m).

Who owns US 67 & Main ST over Draw?

It is owned by the State Highway Agency.