US Bridges

Victory Ave over Aa Center Access RD

Fair

Dallas County, Texas · 0.4M N of Continental Ave · Structure no. 1805709V5960001

Built
2001
24 years old
Condition
Fair
inspected May 2023
Type
Slab
Concrete
Length
36 ft
1 main span
Daily traffic
4,302
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Victory Ave over Aa Center Access RD is a concrete slab carrying Victory Ave over Aa Center Access RD in Dallas County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,302 vehicles a day, roughly 3% of them trucks, projected to reach 8,768 by 2037. The structure is 36 ft (11 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesVictory Ave
CrossesAa Center Access RD
Location0.4M N of Continental Ave
RouteCity Street 0
StateTexas
Coordinates32.78888, -96.81096
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length36 ft (11 m)
Longest span35 ft (10.7 m)
Deck width74 ft (22.6 m)
Roadway width47 ft (14.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,302 (2022)
Projected traffic8,768 by 2037
Trucks3%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Victory Ave over Aa Center Access RD built?

It was built in 2001, making it 24 years old in 2025.

What condition is Victory Ave over Aa Center Access RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Victory Ave over Aa Center Access RD carry?

About 4,302 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Victory Ave over Aa Center Access RD?

The structure is 36 ft (11 m) long with a longest span of 35 ft (10.7 m) and a deck 74 ft wide.

Who owns Victory Ave over Aa Center Access RD?

It is owned by the City or Municipal Highway Agency.