US Bridges

IH 35E Sbml & Hov over Cedar Creek/Dart RR

Good

Dallas County, Texas · 0.8 Mi. North of Il Ave. · Structure no. 180570044202447

Built
2024
1 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
453 ft
4 main spans
Daily traffic
101,192
2023 count
Owner
State
State Highway Agency

About this bridge

IH 35E Sbml & Hov over Cedar Creek/Dart RR is a prestressed concrete stringer/multi-beam or girder carrying IH 35E Sbml & Hov over Cedar Creek/Dart RR in Dallas County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 101,192 vehicles a day, roughly 7% of them trucks, projected to reach 141,669 by 2042. The structure is 453 ft (138.1 m) long and 134 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 35E Sbml & Hov
CrossesCedar Creek/Dart RR
Location0.8 Mi. North of Il Ave.
RouteInterstate 35
StateTexas
Coordinates32.73211, -96.82487
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length453 ft (138.1 m)
Longest span122 ft (37.2 m)
Deck width134 ft (40.8 m)
Roadway width131 ft (39.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic101,192 (2023)
Projected traffic141,669 by 2042
Trucks7%
Lanes on structure9
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad and waterway
Detour if closed1.2 mi (2 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 35E Sbml & Hov over Cedar Creek/Dart RR built?

It was built in 2024, making it 1 years old in 2025.

What condition is IH 35E Sbml & Hov over Cedar Creek/Dart RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does IH 35E Sbml & Hov over Cedar Creek/Dart RR carry?

About 101,192 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is IH 35E Sbml & Hov over Cedar Creek/Dart RR?

The structure is 453 ft (138.1 m) long with a longest span of 122 ft (37.2 m) and a deck 134 ft wide.

Who owns IH 35E Sbml & Hov over Cedar Creek/Dart RR?

It is owned by the State Highway Agency.