IH 35E Sbml & Hov over Brookhaven Dr/Cedar Crk
GoodDallas County, Texas · 3.2 MI N of Lp 12 · Structure no. 180570044202453
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 238 ft
- 2 main spans
- Daily traffic
- 32,700
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E Sbml & Hov over Brookhaven Dr/Cedar Crk is a prestressed concrete stringer/multi-beam or girder carrying IH 35E Sbml & Hov over Brookhaven Dr/Cedar Crk in Dallas County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 32,700 vehicles a day, roughly 7% of them trucks, projected to reach 46,100 by 2035. The structure is 238 ft (72.5 m) long and 159 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E Sbml & Hov over Brookhaven Dr/Cedar Crk built?
It was built in 2024, making it 1 years old in 2025.
What condition is IH 35E Sbml & Hov over Brookhaven Dr/Cedar Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does IH 35E Sbml & Hov over Brookhaven Dr/Cedar Crk carry?
About 32,700 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is IH 35E Sbml & Hov over Brookhaven Dr/Cedar Crk?
The structure is 238 ft (72.5 m) long with a longest span of 125 ft (38.1 m) and a deck 159 ft wide.
Who owns IH 35E Sbml & Hov over Brookhaven Dr/Cedar Crk?
It is owned by the State Highway Agency.