Pgbt EB/IH35E NB over IH 35E & Pgbt Conns
FairDallas County, Texas · IH 35E/SH 190 Interchange · Structure no. 180570019603458
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 3,488 ft
- 4 main spans
- Daily traffic
- 15,302
- 2022 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Pgbt EB/IH35E NB over IH 35E & Pgbt Conns is a steel continuous stringer/multi-beam or girder carrying Pgbt EB/IH35E NB over IH 35E & Pgbt Conns in Dallas County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,302 vehicles a day, projected to reach 12,000 by 2031. The structure is 3,488 ft (1,063.1 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pgbt EB/IH35E NB over IH 35E & Pgbt Conns built?
It was built in 2004, making it 21 years old in 2025.
What condition is Pgbt EB/IH35E NB over IH 35E & Pgbt Conns in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pgbt EB/IH35E NB over IH 35E & Pgbt Conns carry?
About 15,302 vehicles per day (2022 count).
How long is Pgbt EB/IH35E NB over IH 35E & Pgbt Conns?
The structure is 3,488 ft (1,063.1 m) long with a longest span of 227 ft (69.2 m) and a deck 38 ft wide.
Who owns Pgbt EB/IH35E NB over IH 35E & Pgbt Conns?
It is owned by the Local Toll Authority.